中文简体
中文繁体
English
Home
COMPANY INTRODUCTION
Introduction
Word from CRCC Chairman
President's message
Milestone
The Branch Offices
Project
BUSINESS
Domestic
Railway
Highway
Urban Rail Transportation
Water Conservation and Hydroelectricity
Airport and Wharf
House Building
Municipal Works
Overseas Project
Survey, Design and Consulation
Industrial Manufacturing
Real Estate
Logistics
Capital Operation
Others
Scientific Research
Talent Cultivation
Construction Equipment
Environmental Protection and Social Benefit
INVESTOR RELATIONS
Principle of Reform
Share Information
A Hare
H Share
Financial Reports
Annual Reports
Interim Reports
Quarterly Reports
Announcements and Notices
Roadshow
Prospectus
Contact us
NEWS
News
Media Report
Industry Information
Corporation Multimedia
Domestic
Domestic
Railway
Highway
Urban Rail Transportation
Water Conservation and Hydroelectricity
Airport and Wharf
House Building
Municipal Works
Overseas Project
Survey, Design and Consulation
Industrial Manufacturing
Real Estate
Logistics
Capital Operation
Others
Scientific Research
Talent Cultivation
Construction Equipment
Environmental Protection and Social Benefit
·
Shield tunneling machines
·
TBM
·
Tunneling backhoe loaders
·
900-tonne concrete-box-beam arriers
·
Hydraulic rock drilling machines
·
Asphalt Pavers
·
Non-ballast track construction equipment specially designed
·
Hydraulic excavators
·
Wheeled loadersÏ
·
EPB Shield
·
The 32m-Span (900T) Double Track Box Girders Designed for 350 km/h High Speed Railway Line First was produced for the first time in China.
·
The First 550T Integrated Carrying-Erecting Machine in China
·
A Helical Digger
ADD:NO.40 Fuxing Road,beijing 100855 P.R.China
Copyright © 2008 crcc